Other information:
Inspection
1.
Connect the GDS on the Data Link Connector (DLC).
2.
Turn the ignition switch ON.
3.
Measure the output voltage of the APS 1 and 2 at C.T and W.O.T.
Specificati ...
Inspection
1.
TCM ground circuit test : Measure the resistance between TCM and chassis
ground. (Inspect the terminal connected to the chassis ground with the
back of harness connector as the inspection point of TCM side.)
Spec ...