Other information:
Inspection
1.
Measure the pressure of high pressure line by measuring voltage output
between terminal “1” and “2”.
2.
Inspect the voltage value whether it is sufficient to be regular value
or not.
...
Removal and Installation
1.
Disconnect the over flow hose (A).
2.
Remove the reservoir tank (B).
Tightening torque :
7.8 ~ 11.7 N.m (0.8 ~ 1.2 kgf.m, 5.7 ~ 8.6 Ib-ft)
...