Kia Carens: Engine Control System / CVVT Oil Control Valve (OCV) Repair procedures
| 1. |
Turn the ignition switch OFF.
|
| 2. |
Disconnect the OCV connector.
|
| 3. |
Measure resistance between the OCV terminals 1 and 2.
|
| 4. |
Check that the resistance is within the specification.
|
Specification: Refer to “Specification”
|
|
| 1. |
Turn the ignition switch OFF and disconnect the battery negative (-)
cable.
|
| 2. |
Disconnect the CVVT oil control valve connector (A).
|
| 3. |
Remove the installation bolt (B), and then remove the valve from the
engine.
[Bank 1 / Intake]

[Bank 1 / Exhaust]

|
| • |
Install the component with the specified torques.
|
| • |
Note that internal damage may occur when the component is dropped.
If the component has been dropped, inspect before installing.
|
|
| • |
Apply engine oil to the valve O-ring.
|
|
| 1. |
Installation is reverse of removal.
|
CVVT oil control valve installation bolt:
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)
|
|
Circuit Diagram
(M/T)
(A/T)
...
Description
Variable Intake manifold Solenoid (VIS) valve is installed on the intake manifold.
The VIS valve controls the vacuum modulator which activates a valve in the intake
m ...
Other information:
Component Location
1. Front seat cushion cover
...
Keep the battery securely mounted.
Keep the battery top clean and dry.
Keep the terminals and connections clean, tight, and coated with petroleum
jelly or terminal grease.
Rinse any spilled electrolyte from the battery immediately with a solution
of water and baking soda.
If the vehicle i ...